As one of the Project Controls Experts at Cleopatra Enterprise, Stephanie Ritchie sees a lot of common mistakes in the field. In this video blog she discusses one of them: being reactive instead of proactive.

 


Who are proactive project managers?

They are people who focus their efforts and attention on the long-term as opposed to responding to what’s happening in the present moment. However, even though this golden rule may seem obvious, it is one of the most difficult to put into practice. It is even one of the major causes of cost overruns.

In many cases, also in my experience, project managers find themselves playing the role of a firefighter. They put our spot fires as they arise. Because everyone is already time-poor, no one really has the opportunity to explore all the options and find the right solution.

What does this mean?

This means that other tasks are being delayed, dealing with unexpected expenses, and leaving your project vulnerable to further failure. Therefore, it is very important to act proactively and have a plan in place to deal with situations like this.

How can you avoid being reactive?

By incorporating the following 4 things throughout your entire project lifecycle:

1. Building a robust estimate

A robust estimate is an estimate that is detailed, precise, and incorporates lessons learned from past projects. Such estimates allow you to better predict and respond to events in a project. Once the estimate is complete it is of utmost importance that you align your cost estimate and budget.

2. Aligning your cost estimate and budget through standardized breakdown structures

You should be able to seamlessly translate your cost estimates to your budget, without having to restructure your estimate. To do this, you should ensure your budget items and breakdown structures are aligned. This alignment helps you to prevent any discrepancies between the estimating and cost control teams. Once this is done, then it is important to ensure you monitor your project properly.

3. Monitoring Earned Value Management and Cost Variances

With a dedicated EVM tracking tool, you can compare the planned performance to the actual schedule and cost performance. This means you can identify any differences, and communicate them within the project team. It also helps you act upon these variances to ensure the project continues in the direction you want to head

4. Identifying the valuable project KPIs

There is a fine line between the Key Performance Index and general metrics. It is important that you define which metrics are the ‘key’ indicators. Which ones must really be tracked and used to identify if something needs attention. This allows the project team to proactively address potential cost overruns. Keep in mind that aligning the key KPIs with project processes is also essential. Ensure from an early stage that these are clearly understood throughout the team.

 

Do you want more information about how to be proactive, or want to speak to an expert? Feel free to contact us.

 

About Stephanie

Stephanie Ritchie holds a Bachelor’s degree in Commerce and a Master’s degree in Engineering (Civil). Having worked in the field as a Site and Project Engineer internationally for a number of years, both in the offshore and construction industry, Stephanie brings a wealth of knowledge as to how project teams can improve their project control processes.

As she is born and raised in Australia, her purpose is to empower Australian organizations to improve their project performance via digitalization. Therefore, she will be representing Cleopatra Enterprise at Project Controls Expo Australia 2022.

 


 

Related articles

Cleopatra Enterprise at the Virtual Project Controls Expo 2020

Project controls improvement opportunities in times of coronavirus

5 greatest benefits of using a Project Controls Software

Infographic: How to fix the Top 10 Project Cost Management mistakes

Download Case Study

Boskalis Case Study

Request a Demo